Amazon cover image
Image from Amazon.com

Modular electricity storage : benefits and costs / Brent N. Mendell and Lisa P. Brunwick, editors.

Contributor(s): Material type: TextTextSeries: Energy science, engineering and technology series | Electrical engineering developments seriesPublisher: New York : Nova Science Publishers, Inc., [2012]Description: 1 online resourceContent type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 9781614704591
  • 1614704597
  • 161470533X
  • 9781614705338
Subject(s): Genre/Form: Additional physical formats: Print version:: Modular electricity storageDDC classification:
  • 333.793/2 23
LOC classification:
  • TK2980
Online resources:
Contents:
MODULAR ELECTRICITY STORAGE: BENEFITS AND COSTS ; MODULAR ELECTRICITY STORAGE: BENEFITS AND COSTS ; Contents; Preface; Electric Utility Transmission and Distribution Upgrade Deferral Benefits from Modular Electricity Storage*; Notice; Abstract; Acknowledgment; Acronyms and Abbreviations; Executive Summary; 1. Introduction; Modular Electricity Storage for T & D Deferral, an Example; Utility Revenue Requirement for T & D Equipment; Capital Plant Carrying Charges; Expenses; Annual Revenue Requirement; T & D Avoided Cost; Single-Year Deferral Benefit; Multi-Year Deferral Benefit; MES Transportability.
T & D Upgrade Marginal Cost2. T & D Deferral Financial Benefit; Introduction; Annual Deferral Benefit for MES; Multi-Year Deferral Benefit for MES; Diminishing Benefit for Multi-Year Deferrals; MES Redeployment; T & D Equipment Residual Value; T & D Annual Cost Among U.S. Electric Utilities; FERC Form 1 Data: Oak Ridge National Laboratories Report; Rate Assistance Program Report; Utility T & D Deferral Cost Variability; The Range of T & D Deferral Benefits; EPRI/PG & E Distributed Utility Penetration Study (DUPS); 3. Deployment Situations for T Deferral Applications Introduction.
Decision Criteria SummaryHigh T & D Upgrade Cost; High Peak-to-Average Demand Ratio; Modest Projected Overload; Slow Load Growth; Uncertainty About Block Load Additions; Uncertainty About T & D Construction Delays; Distribution Budget Optimization; Benefits Aggregation for Attractive Value Propositions; 4. Storage Characteristics for T Deferral Introduction; Required Characteristics; Reliability; Power Quality; Wave Form; High Power Factor; Frequency Stability; Harmonics; Ramp Rate; Charge Rate; Other Notable Characteristics; Roundtrip Efficiency; Operation and Maintenance Needs and Cost.
Emergency or Short Duration Power CapabilityLifetime Charge-Discharge Cycles; Standby Losses; Energy and Power Density; Plant Footprint and Volume; Modularity; Transportability; Easily Deployable ("Plug and Play"); 5. Storage Sizing for T & D Deferral; Storage Power Output Requirements; Storage Discharge Duration Requirements; Diesel Generation for Storage Backup; 6. Generalizing the Range of the T Deferral Benefit; 7. Complementary Uses and Benefits; Introduction to Complementary Uses; Complementary Uses: General Considerations; Peak Demand Frequency; Power Rating; Stored Energy Limitation.
MES Reliability"Perfect" MES Capacity; Incremental Benefit/Cost Considerations; Myriad Institutional Challenges; Reactive Power Capability; Complementary Uses; Electric Energy Time-shift; Electric Supply Capacity; Electric Supply Reserve Capacity; Reduce Transmission Congestion; Transmission Support and Stability; Power Factor Correction; Voltage Support; On-Site Power Quality; Electricity Service Reliability; Retail Time-of-Use Energy Cost Reduction; Renewables Generation Firming; Renewable Energy Time-Shift; Demand Management; Seasonal Deployment for Locational Benefits.
Item type:
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Home library Collection Call number Materials specified Status Date due Barcode
Electronic-Books Electronic-Books OPJGU Sonepat- Campus E-Books EBSCO Available

Includes bibliographical references (pages 108) and index.

Description based on print version record and CIP data provided by publisher.

English.

MODULAR ELECTRICITY STORAGE: BENEFITS AND COSTS ; MODULAR ELECTRICITY STORAGE: BENEFITS AND COSTS ; Contents; Preface; Electric Utility Transmission and Distribution Upgrade Deferral Benefits from Modular Electricity Storage*; Notice; Abstract; Acknowledgment; Acronyms and Abbreviations; Executive Summary; 1. Introduction; Modular Electricity Storage for T & D Deferral, an Example; Utility Revenue Requirement for T & D Equipment; Capital Plant Carrying Charges; Expenses; Annual Revenue Requirement; T & D Avoided Cost; Single-Year Deferral Benefit; Multi-Year Deferral Benefit; MES Transportability.

T & D Upgrade Marginal Cost2. T & D Deferral Financial Benefit; Introduction; Annual Deferral Benefit for MES; Multi-Year Deferral Benefit for MES; Diminishing Benefit for Multi-Year Deferrals; MES Redeployment; T & D Equipment Residual Value; T & D Annual Cost Among U.S. Electric Utilities; FERC Form 1 Data: Oak Ridge National Laboratories Report; Rate Assistance Program Report; Utility T & D Deferral Cost Variability; The Range of T & D Deferral Benefits; EPRI/PG & E Distributed Utility Penetration Study (DUPS); 3. Deployment Situations for T Deferral Applications Introduction.

Decision Criteria SummaryHigh T & D Upgrade Cost; High Peak-to-Average Demand Ratio; Modest Projected Overload; Slow Load Growth; Uncertainty About Block Load Additions; Uncertainty About T & D Construction Delays; Distribution Budget Optimization; Benefits Aggregation for Attractive Value Propositions; 4. Storage Characteristics for T Deferral Introduction; Required Characteristics; Reliability; Power Quality; Wave Form; High Power Factor; Frequency Stability; Harmonics; Ramp Rate; Charge Rate; Other Notable Characteristics; Roundtrip Efficiency; Operation and Maintenance Needs and Cost.

Emergency or Short Duration Power CapabilityLifetime Charge-Discharge Cycles; Standby Losses; Energy and Power Density; Plant Footprint and Volume; Modularity; Transportability; Easily Deployable ("Plug and Play"); 5. Storage Sizing for T & D Deferral; Storage Power Output Requirements; Storage Discharge Duration Requirements; Diesel Generation for Storage Backup; 6. Generalizing the Range of the T Deferral Benefit; 7. Complementary Uses and Benefits; Introduction to Complementary Uses; Complementary Uses: General Considerations; Peak Demand Frequency; Power Rating; Stored Energy Limitation.

MES Reliability"Perfect" MES Capacity; Incremental Benefit/Cost Considerations; Myriad Institutional Challenges; Reactive Power Capability; Complementary Uses; Electric Energy Time-shift; Electric Supply Capacity; Electric Supply Reserve Capacity; Reduce Transmission Congestion; Transmission Support and Stability; Power Factor Correction; Voltage Support; On-Site Power Quality; Electricity Service Reliability; Retail Time-of-Use Energy Cost Reduction; Renewables Generation Firming; Renewable Energy Time-Shift; Demand Management; Seasonal Deployment for Locational Benefits.

eBooks on EBSCOhost EBSCO eBook Subscription Academic Collection - Worldwide

There are no comments on this title.

to post a comment.

O.P. Jindal Global University, Sonepat-Narela Road, Sonepat, Haryana (India) - 131001

Send your feedback to glus@jgu.edu.in

Hosted, Implemented & Customized by: BestBookBuddies   |   Maintained by: Global Library